Skip to main content

SPARK-SIS Project Evolution Framework

The 8-Phase Journey from Idea to Archive

A systematic approach to project evolution that ensures nothing falls through the cracks.

Phase Definitions

1. INBOX - Capture Everything

Purpose: Never lose an idea or request

Key Actions:

  • Capture without judgment
  • Add basic metadata
  • Assign initial priority
  • No analysis yet

Exit Criteria: Weekly triage session

2. BACKLOG - Prioritize Ruthlessly

Purpose: Order by value and effort

Key Actions:

  • Score value (1-10)
  • Estimate effort (XS/S/M/L/XL)
  • Map dependencies
  • Calculate ROI

Exit Criteria: ROI score > threshold

3. SPEC - Define Precisely

Purpose: Remove all ambiguity

Key Deliverables:

  • User stories
  • Technical requirements
  • UI/UX designs
  • Test scenarios
  • Success metrics

Exit Criteria: Stakeholder sign-off

4. PSEUDO - Design Solution

Purpose: Plan before building

Key Activities:

  • Algorithm design
  • System architecture
  • Database schema
  • API design
  • Security planning

Exit Criteria: Technical review passed

5. ARCH - Build Foundation

Purpose: Implement core functionality

Development Standards:

  • Test-driven development
  • 80% code coverage
  • Peer code reviews
  • Documentation as you go

Exit Criteria: All tests passing

6. REFINE - Polish to Perfection

Purpose: Optimize and enhance

Enhancement Areas:

  • Performance tuning
  • UX improvements
  • Error recovery
  • Monitoring setup
  • Documentation

Exit Criteria: Production ready

7. COMPLETE - Ship It

Purpose: Deploy with confidence

Launch Checklist:

  • Feature flags configured
  • Rollback plan ready
  • Support team briefed
  • Monitoring active
  • Announcement prepared

Exit Criteria: Successful production deployment

8. ARCHIVE - Learn & Improve

Purpose: Capture lessons learned

Documentation:

  • Performance metrics
  • User feedback
  • Technical decisions
  • Process improvements
  • Reusable components

Exit Criteria: Knowledge transferred

WIP Limits

Preventing Overload

PhaseWIP LimitRationale
INBOXUnlimitedCapture everything
BACKLOG50 itemsFocus on priority
SPEC5 itemsQuality over quantity
PSEUDO3 itemsDeep thinking required
ARCH3 itemsFocused development
REFINE5 itemsPolish in parallel
COMPLETE2 itemsCareful deployment
ARCHIVEUnlimitedContinuous learning

Velocity Tracking

Sprint Metrics

Cycle Time

Phase TransitionTargetActual
INBOX → BACKLOG7 days5 days
BACKLOG → SPEC14 days12 days
SPEC → PSEUDO3 days2 days
PSEUDO → ARCH1 day1 day
ARCH → REFINE5 days6 days
REFINE → COMPLETE2 days2 days
COMPLETE → ARCHIVE7 days5 days
Total Cycle39 days33 days

Integration with Tools

Notion Sync

  • Automatic project creation
  • Status synchronization
  • Team collaboration
  • Document management

GitHub Integration

  • Issue tracking
  • Pull request linking
  • Automated workflows
  • Release management

Slack Notifications

  • Phase transitions
  • Blockers alerts
  • Daily summaries
  • Sprint reports

Best Practices

Do's

  • ✅ Move cards daily
  • ✅ Respect WIP limits
  • ✅ Document decisions
  • ✅ Celebrate completions
  • ✅ Learn from archives

Don'ts

  • ❌ Skip phases
  • ❌ Exceed WIP limits
  • ❌ Rush specifications
  • ❌ Deploy without tests
  • ❌ Forget retrospectives

Success Patterns

Fast Track

For urgent fixes: INBOX → SPEC → ARCH → COMPLETE

Innovation Path

For new features: Full 8-phase journey

Experiment Loop

For prototypes: INBOX → PSEUDO → ARCH → ARCHIVE

Common Pitfalls

PitfallImpactSolution
Spec creepDelaysLock specs early
WIP overflowContext switchingEnforce limits
Skipping REFINETech debtMandatory phase
Poor archivingLost knowledgeTemplates required

Metrics & KPIs

Health Indicators

  • Flow Efficiency: >70%
  • Cycle Time Variance: <20%
  • WIP Adherence: >90%
  • Archive Rate: 100%

Quality Metrics

  • Defect Escape Rate: <5%
  • Test Coverage: >80%
  • Documentation Score: >8/10
  • Retrospective Actions: >3 per sprint

Templates & Resources

Available Templates

  • Spec document template
  • Pseudocode guidelines
  • Architecture decision records
  • Retrospective format

Training Materials

  • Video walkthroughs
  • Best practice guides
  • Case studies
  • Office hours schedule

Next: Z7 Consciousness Framework (Coming Soon)